The method ​

The rule lives in code; judgement lives in the prompt. Every role below is a separate run with its own rights, and wherever a right matters it is held by tooling — an allow-list of tools, a hook, a function — rather than by asking the model nicely.

Roles ​

RoleDecidesWhat holds its rightsCadence
Visionthe goalwritten by a person, rarely; for the loop itself the vision is its own method—
Ownerwhat to move, what to merge, whom to hand work to, when to escalateread-only tools; prints one move per run, a script executes itevery 2 h
Beathands out ready workthe same script, no model callevery 10 min
Linesone backlog item → one pull requestfive lines on models from four providers; non-primary models run code-only; an item is claimed by a leaseevery 5 h
Criticis this diff good enoughmerges only on approval, green CI and no conflict, pinned to the reviewed commit; on a person's pull request it only advisesper PR
Convergencewhich gap to close nextno write tools at all; three possible moves; runs only on an empty queue, at most daily≤ daily
Watcherdoes the capability work on the live systemread-only token; four verdicts, including "a precondition was missing"per project
Scouthow others solve the same problembrings one idea with the source's licence; never copies foreign code~3.5 days
Auditan independent look at everything merged in a daya model from another provider, read-only sandbox; advisorydaily
Digeststhe day and the weekmetrics and code survivaldaily, weekly

Each run checks out a snapshot of the loop's own main and logs its version: what runs is always text that went through review.

The merge policy is a function ​

Before anything is merged, one function decides — and it is part of the concept, so only a person may change it:

  • drafts and pull requests that conflict with main are refused;
  • zero checks means "still running", not "passed"; failed and unfinished checks refuse;
  • a pull request must be at least two hours old and at most 4,000 lines;
  • a change to the loop's own scripts merges only with a test in the same diff;
  • a CI workflow change is limited to 40 lines.

The backlog is a plain file in the project with a fixed vocabulary of statuses. An item gets three attempts, then becomes blocked with a diagnosis. An escalation with fewer than two recorded attempts is rejected, and so is a repeat without new attempts inside the cool-down.

Invariants ​

Every one of these was added after a concrete failure, not in advance.

A read has three outcomes, not two: "no", "this many" and "I don't know". A failed read is never reported as "nothing there".

A gate is enforced by code, not by a request. A licence requirement written only in a prompt would let a copyleft licence through silently.

The fence holds before execution. A pre-tool hook refuses a single command and names the reason, instead of discarding a whole run after the fact — before it, three runs in a row and fifteen finished verdicts went to waste. A broken hook refuses; it never lets things through.

A gate that falsely accuses costs more than a missing one. Gates are added after a real failure, not pre-emptively.

An escalation needs attempts; a request for resources needs evidence.

"Waiting" is expressed only by an item's status, never by text inside it.

A test must be able to fail — and that is checked by mutation. About one commit in four in the loop's history records the mutation its test was checked against.

A test stub behaves like the real reader, rather than echoing the expected result.

A primitive that refuses "usually" is not compare-and-set. Two leases on one item once produced byte-identical commits, and the second push answered "up-to-date" with exit code 0. The fix put the run's identity into the commit, and a test pins it.

A migration ends with deleting the second copy and every mention of the old paths.

A measure the measured party can rewrite will be gamed. Thresholds are part of the concept: a person changes them, and only between measurement windows.

A machine does not approve changes to the machine that approves changes. Hence the three tiers of merge rights.

Count what landed, not what started. The number of pull requests and lines of code both lie.

What a person keeps ​

For good: the goal, the weight between projects, money and access, and irreversible actions. For now: a second judge for changes to the loop itself, onboarding a new project, and a spending budget.